AdventureBound Gear | Extreme Adventure, Outdoor Essentials, Water Sports & Trail Exploration – 40% Off All Gear
AdventureBound Gear | Extreme Adventure, Outdoor Essentials, Water Sports & Trail Exploration – 40% Off All Gear AdventureBound Gear | Extreme Adventure, Outdoor Essentials, Water Sports & Trail Exploration – 40% Off All Gear
Cart(0)
Home outdoor essentials cooler box
Honeywell 2.6 Gallon Indoor Portable Evaporative Air Cooler for Garage, Basement, Attic, 115V, for up to 120 Sq. Ft. with Remote, Quiet, Low Energy, Compact, White
Honeywell 2.6 Gallon Indoor Portable Evaporative Air Cooler for Garage, Basement, Attic, 115V, for up to 120 Sq. Ft. with Remote, Quiet, Low Energy, Compact, White
  • DefaultTitle

$ 60.97

$ 46.90

Please select combo product attributes
The combo subtotal is $,SAVE$
Unavailable

Product Details

Condition: Open-Box/Like New

  • Mimic the Comfort of a Cool Lake Breeze: Built to cool your immediate area; This evaporative cooler is easily portable for personal evaporative cooling
  • Easy Maintenance and Operation: A low water alarm, easy-access water fill door plus a washable dust filter and Honeycomb Cooling media makes for simple operation and maintenance
  • Energy Efficient Cooling for Dry Climates: Evaporative air coolers work best in dry regions with relative humidity under 50-60%; Highly energy efficient, with low power consumption, swamp coolers are a great cooling alternative to fans, providing a moist, cool breeze in the comfort of your own home
  • 3-in-1 Portable Swamp Cooler Indoor: Set for evaporative cooling or a more gentle, fan-only breeze during warm days, and use as a humidifier to keep air hydrated during the colder, winter months
  • Not an Air Conditioner and Not Just a Fan: Environmentally friendly portable air cooler reduces temperature through water evaporation
Brief content visible, double tap to read full content.
Full content visible, double tap to read brief content.

Details

Brand
Honeywell
Material
Plastic
Mounting Type
Freestanding
Special Feature
Adjustable Speed, Digital Display, Oscillating Fan, Low Water Indicator
Color
White
You May Also Like
Cart
AdventureBound Gear | Extreme Adventure, Outdoor Essentials, Water Sports & Trail Exploration – 40% Off All Gear
Your cart is currently empty.